Build certainty into every schedule.

Live design, production, delivery and framing intelligence—secured for the NuFrame team.

Integrated Schedule

Company-wide high-level schedule. View only.
DEV
—
Not signed in
Production read only

Access Request Pending

Your NuFrame Microsoft identity is verified. An Administrator must approve PCC access and department permissions before operational data is available.

Active Projects0
Upcoming Projects0
Projected Dates MetN/A
Schedule reliability
Delays0
Same-project dates moved worse
Attention Required0

Integrated Master Schedule

High level: Embeds • Slab • Design • Production • Framing
Active Projects0
Upcoming Projects0
Date ChangesN/A
Same-Project Conflicts0

Operations Schedule

Open Milestones0
On Track0
At Risk0
Projected Late0

Design Schedule + Projection

ProgressHard datesProjected overrun

Production Schedule Intelligence

Metrics recalculate to selected planning horizon
Projected Average Panel Dwell0d
Average: Production complete → 50% through effective Framing
Production Lead0d
Production complete → Framing start
Active Projects0
Upcoming Changeovers0
Pipeline Capacity0%
Optimal-window order file vs baseline plant capacity • next 90 days
5-Day Avg LF / Day0
Rolling working-day average
Needed LF / Day0
Optimization Score0%
Current plans without warnings (50%), target dwell (30%), and minimum Design lead (20%).
Design Lead0d
IFF complete → Production
HealthHealthy

Production Integrated Schedule

Project • Task • Total LF • Design IFF • Production • Framing
Today's Production
Loading
Source freshness unavailable
Today's Project Contribution
Active Projects0
5-Day Avg LF / Day0 LF
Needed LF / Day0 LF
Pipeline Capacity0%
Projected Average Panel DwellUnavailable
Planned / Total LFUnavailable
Portfolio Framing CompleteUnavailable
Design CompleteUnavailable
Production Scope CompleteUnavailable
Deliveries • Next 7 Days0
Optimization ScoreUnavailable
Avg Design / Production LeadUnavailable

Capacity + Order File Outlook

Forward 12-Month Outlook

Planned demandCapacity pressureNo current plan demand
Bars use authoritative current PCC plans only. Recommendations are excluded.

Executive Insights

Production Output

Daily plant LF from Wall Stack Completion, plus reconciled PCC manual entries where source output is absent.
Moving averages

Order File

Current and upcoming framing commitments
StatusProjectFraming StartFraming EndProduction Outlook

Executive Weekly Report

Generate the executive portfolio, production and order-file brief.

Active Project Progress

Current active schedules and projects with matched Production packages. Historical projects are excluded.
ProjectDesignProductionFramingNext Delivery
Live portfolio progress is loading.

General Settings

Available to all users.
Production read only
Access is determined by the authenticated PCC account. General Settings remain available to everyone.
Install availability is being checked.

General Settings